Pennsylvania

06/2011

The municipal sewerage authority upgraded its WWTP and added the Cogeneration Facility. The gas treatment system was sized to supply the G6-150kW unit in 24/7 operation.

The CHP unit and the gas treatment system is located outside. To protect against rain and snow the unit is sitting on a pad under a roof.

In January 2012 the unit was pre-commissioned and is waiting for the final power up to operate as planned.